Proposal · CAD
Kitchen remodel for Riley Novak
This proposal is locked. It cannot be edited or signed again.
The problem
The existing kitchen no longer supports how the household cooks, stores, and gathers. Worn surfaces, a dated layout, and tired fixtures slow every meal and make the room feel smaller than it is.
The solution
Copperline Kitchen & Bath Co. delivers a scoped renovation with site measure, licensed trades, and one point of contact from demolition through walkthrough. Cabinets, surfaces, and services are sequenced so the household can plan around a clear calendar instead of an open-ended job.
Scope
Budget range: $30,000 to $50,000 · Kickoff Jan 18, 2027
- Cabinets
- Countertops
- Tile
- Plumbing fixtures
- Lighting
- Flooring
- Demolition & disposal
- Design consultation
Timeline
Phase 1
Design & Measure
Jan 18, 2027 to Jan 28, 2027
9 business days
On-site measure, existing-condition photos, and finish confirmation for the kitchen. Drawings and a written schedule go to the client before demolition.
Phase 2
Demolition & Prep
Jan 29, 2027 to Feb 16, 2027
12 business days
Protect adjacent rooms, remove designated finishes, and prepare substrate, plumbing, and electrical rough-in for the kitchen.
Phase 3
Install & Finish
Feb 17, 2027 to Mar 22, 2027
24 business days
Set cabinets or vanities, counters, tile, fixtures, lighting, and flooring in the published sequence, then punch remaining items.
Phase 4
Walkthrough & Handoff
Mar 23, 2027 to Mar 24, 2027
2 business days
Client walkthrough, care notes, and close-out of remaining items. Final balance is due on completion.
Investment
| Item | Code | Amount (CAD) |
|---|---|---|
| Kitchen cabinetry package: made-to-measure boxes, doors, and hardware | KIT-CAB | CA$18,500.00 |
| Kitchen countertops: quartz slab supply and finish | KIT-CNT | CA$7,200.00 |
| Kitchen tile: backsplash and wet-wall tile set | KIT-TIL | CA$3,800.00 |
| Kitchen plumbing fixtures: sink, faucet, and supply trim | KIT-PLB | CA$2,400.00 |
| Kitchen lighting: ceiling, under-cabinet, and control | KIT-LGT | CA$1,800.00 |
| Kitchen flooring: supply, install, and transitions | KIT-FLR | CA$4,200.00 |
| Kitchen demolition and disposal: tear-out and binning | KIT-DEM | CA$2,900.00 |
| Kitchen design consultation: measure, drawings, and schedule | KIT-DSN | CA$1,500.00 |
| Total | CA$42,300.00 | |
| 50% deposit, due at signing | CA$21,150.00 | |
| 50% balance, due on completion | CA$21,150.00 | |
Prices shown before applicable taxes
Terms
- Figures are in Canadian dollars and are valid until Oct 28, 2026.
- Prices shown before applicable taxes. Applicable taxes are determined at signing.
- A 50% deposit (CA$21,150.00) is due at signing. The remaining CA$21,150.00 is due on completion.
- Deposit refundable until 5 business days before scheduled kickoff, minus documented out-of-pocket costs; non-refundable once the first kickoff meeting happens.
- Refund deadline for this proposal: Jan 11, 2027 (five business days before kickoff on Jan 18, 2027).
- Timelines count business days only (Monday to Friday, excluding Ontario public holidays) and assume site access plus timely selections.
- Changes to scope after signing are priced as written change orders before the extra work starts.
Signature
Demo signature, not legally binding. A real build would use Dropbox Sign or DocuSign.
Riley Novak
Signed Oct 15, 2026, 5:40 AM ET