Proposal · CAD
Kitchen + Bath for Sam Okonkwo
This proposal is locked. It cannot be edited or signed again.
The problem
Kitchen and bathroom both need a coordinated reset. Surfaces, storage, and plumbing have aged unevenly, so work in one room would leave the other looking and performing like a leftover.
The solution
Copperline Kitchen & Bath Co. delivers a scoped renovation with site measure, licensed trades, and one point of contact from demolition through walkthrough. Both rooms share a schedule, a finish language, and a single crew so selections and site days stay aligned.
Scope
Budget range: $50,000 to $80,000 · Kickoff Sep 14, 2026
- Cabinets
- Countertops
- Tile
- Plumbing fixtures
- Lighting
- Flooring
- Demolition & disposal
- Design consultation
Timeline
Phase 1
Design & Measure
Sep 14, 2026 to Sep 24, 2026
9 business days
On-site measure, existing-condition photos, and finish confirmation for the kitchen and bathroom. Drawings and a written schedule go to the client before demolition.
Phase 2
Demolition & Prep
Sep 25, 2026 to Oct 13, 2026
12 business days
Protect adjacent rooms, remove designated finishes, and prepare substrate, plumbing, and electrical rough-in for the kitchen and bathroom.
Phase 3
Install & Finish
Oct 14, 2026 to Nov 16, 2026
24 business days
Set cabinets or vanities, counters, tile, fixtures, lighting, and flooring in the published sequence, then punch remaining items.
Phase 4
Walkthrough & Handoff
Nov 17, 2026 to Nov 18, 2026
2 business days
Client walkthrough, care notes, and close-out of remaining items. Final balance is due on completion.
Investment
| Item | Code | Amount (CAD) |
|---|---|---|
| Combined cabinetry: kitchen boxes plus bathroom vanity | KBA-CAB | CA$22,800.00 |
| Combined countertops: kitchen slabs plus vanity top | KBA-CNT | CA$8,600.00 |
| Combined tile: kitchen backsplash plus bathroom wet walls | KBA-TIL | CA$10,800.00 |
| Combined plumbing fixtures: kitchen and bathroom trim packages | KBA-PLB | CA$7,200.00 |
| Combined lighting: both rooms, including wet-rated fittings | KBA-LGT | CA$2,800.00 |
| Combined flooring: kitchen field plus bathroom dry floor | KBA-FLR | CA$6,100.00 |
| Combined demolition and disposal for both rooms | KBA-DEM | CA$4,600.00 |
| Combined design consultation: shared drawings and schedule | KBA-DSN | CA$2,200.00 |
| Total | CA$65,100.00 | |
| 50% deposit, due at signing | CA$32,550.00 | |
| 50% balance, due on completion | CA$32,550.00 | |
Prices shown before applicable taxes
Terms
- Figures are in Canadian dollars and are valid until Sep 3, 2026.
- Prices shown before applicable taxes. Applicable taxes are determined at signing.
- A 50% deposit (CA$32,550.00) is due at signing. The remaining CA$32,550.00 is due on completion.
- Deposit refundable until 5 business days before scheduled kickoff, minus documented out-of-pocket costs; non-refundable once the first kickoff meeting happens.
- Refund deadline for this proposal: Sep 4, 2026 (five business days before kickoff on Sep 14, 2026).
- Timelines count business days only (Monday to Friday, excluding Ontario public holidays) and assume site access plus timely selections.
- Changes to scope after signing are priced as written change orders before the extra work starts.
Signature
Demo signature, not legally binding. A real build would use Dropbox Sign or DocuSign.
Sam Okonkwo
Signed Aug 21, 2026, 9:05 AM ET
SHA-256 2c46a4d326aaf76d71ab372fccb00aa43a539addf87e81927898a9178cdee7af
Deposit reference DEMO-C0PPER1