Bathroom remodel for Avery Chen
The problem
The bathroom is past its useful life: tired finishes, unreliable fixtures, and a layout that fights daily use. Moisture, grout, and storage problems are stacking up rather than staying contained.
The solution
Copperline Kitchen & Bath Co. delivers a scoped renovation with site measure, licensed trades, and one point of contact from demolition through walkthrough. Wet-area assemblies, fixtures, and ventilation are rebuilt as a package so the room stays dry, quiet, and easy to keep.
Scope
Budget range: $15,000 to $30,000 · Kickoff Dec 7, 2026
- Tile
- Plumbing fixtures
- Flooring
- Demolition & disposal
Timeline
Phase 1
Design & Measure
Dec 7, 2026 to Dec 11, 2026
5 business days
On-site measure, existing-condition photos, and finish confirmation for the bathroom. Drawings and a written schedule go to the client before demolition.
Phase 2
Demolition & Prep
Dec 14, 2026 to Dec 23, 2026
8 business days
Protect adjacent rooms, remove designated finishes, and prepare substrate, plumbing, and electrical rough-in for the bathroom.
Phase 3
Install & Finish
Dec 24, 2026 to Jan 19, 2027
16 business days
Set cabinets or vanities, counters, tile, fixtures, lighting, and flooring in the published sequence, then punch remaining items.
Phase 4
Walkthrough & Handoff
Jan 20, 2027 to Jan 21, 2027
2 business days
Client walkthrough, care notes, and close-out of remaining items. Final balance is due on completion.
Investment
| Item | Code | Amount (CAD) |
|---|---|---|
| Bathroom tile: floor, wet walls, and shower assembly | BTH-TIL | CA$7,800.00 |
| Bathroom plumbing fixtures: toilet, faucet, shower, and trim | BTH-PLB | CA$5,400.00 |
| Bathroom flooring outside the tiled wet zone | BTH-FLR | CA$2,400.00 |
| Bathroom demolition and disposal: tear-out and binning | BTH-DEM | CA$2,100.00 |
| Total | CA$17,700.00 | |
| 50% deposit, due at signing | CA$8,850.00 | |
| 50% balance, due on completion | CA$8,850.00 | |
Prices shown before applicable taxes
Terms
- Figures are in Canadian dollars and are valid until Oct 30, 2026.
- Prices shown before applicable taxes. Applicable taxes are determined at signing.
- A 50% deposit (CA$8,850.00) is due at signing. The remaining CA$8,850.00 is due on completion.
- Deposit refundable until 5 business days before scheduled kickoff, minus documented out-of-pocket costs; non-refundable once the first kickoff meeting happens.
- Refund deadline for this proposal: Nov 30, 2026 (five business days before kickoff on Dec 7, 2026).
- Timelines count business days only (Monday to Friday, excluding Ontario public holidays) and assume site access plus timely selections.
- Changes to scope after signing are priced as written change orders before the extra work starts.