Example demo, fictional data

Proposal · CAD

Bathroom remodel for Avery Chen

Prepared for
Avery Chen
avery.chen@example.com
Date
Oct 16, 2026
Valid until
Oct 30, 2026
Status
Sent

The problem

The bathroom is past its useful life: tired finishes, unreliable fixtures, and a layout that fights daily use. Moisture, grout, and storage problems are stacking up rather than staying contained.

The solution

Copperline Kitchen & Bath Co. delivers a scoped renovation with site measure, licensed trades, and one point of contact from demolition through walkthrough. Wet-area assemblies, fixtures, and ventilation are rebuilt as a package so the room stays dry, quiet, and easy to keep.

Scope

Budget range: $15,000 to $30,000 · Kickoff Dec 7, 2026

  • Tile
  • Plumbing fixtures
  • Flooring
  • Demolition & disposal

Timeline

Phase 1

Design & Measure

Dec 7, 2026 to Dec 11, 2026

5 business days

On-site measure, existing-condition photos, and finish confirmation for the bathroom. Drawings and a written schedule go to the client before demolition.

Phase 2

Demolition & Prep

Dec 14, 2026 to Dec 23, 2026

8 business days

Protect adjacent rooms, remove designated finishes, and prepare substrate, plumbing, and electrical rough-in for the bathroom.

Phase 3

Install & Finish

Dec 24, 2026 to Jan 19, 2027

16 business days

Set cabinets or vanities, counters, tile, fixtures, lighting, and flooring in the published sequence, then punch remaining items.

Phase 4

Walkthrough & Handoff

Jan 20, 2027 to Jan 21, 2027

2 business days

Client walkthrough, care notes, and close-out of remaining items. Final balance is due on completion.

Investment

Proposal line items in Canadian dollars
Item Code Amount (CAD)
Bathroom tile: floor, wet walls, and shower assembly BTH-TIL CA$7,800.00
Bathroom plumbing fixtures: toilet, faucet, shower, and trim BTH-PLB CA$5,400.00
Bathroom flooring outside the tiled wet zone BTH-FLR CA$2,400.00
Bathroom demolition and disposal: tear-out and binning BTH-DEM CA$2,100.00
Total CA$17,700.00
50% deposit, due at signing CA$8,850.00
50% balance, due on completion CA$8,850.00

Prices shown before applicable taxes

Terms

  • Figures are in Canadian dollars and are valid until Oct 30, 2026.
  • Prices shown before applicable taxes. Applicable taxes are determined at signing.
  • A 50% deposit (CA$8,850.00) is due at signing. The remaining CA$8,850.00 is due on completion.
  • Deposit refundable until 5 business days before scheduled kickoff, minus documented out-of-pocket costs; non-refundable once the first kickoff meeting happens.
  • Refund deadline for this proposal: Nov 30, 2026 (five business days before kickoff on Dec 7, 2026).
  • Timelines count business days only (Monday to Friday, excluding Ontario public holidays) and assume site access plus timely selections.
  • Changes to scope after signing are priced as written change orders before the extra work starts.