Example demo, fictional data

Proposal · CAD

Kitchen remodel for Jordan Reyes

Prepared for
Jordan Reyes
jordan.reyes@example.com
Date
Oct 17, 2026
Valid until
Oct 31, 2026
Status
Draft
Download PDF

Send to client writes a message to the Demo Outbox on this server. It does not send email.

The problem

The existing kitchen no longer supports how the household cooks, stores, and gathers. Worn surfaces, a dated layout, and tired fixtures slow every meal and make the room feel smaller than it is.

The solution

Copperline Kitchen & Bath Co. delivers a scoped renovation with site measure, licensed trades, and one point of contact from demolition through walkthrough. Cabinets, surfaces, and services are sequenced so the household can plan around a clear calendar instead of an open-ended job.

Scope

Budget range: $15,000 to $30,000 · Kickoff Nov 16, 2026

  • Cabinets
  • Countertops
  • Lighting
  • Design consultation

Timeline

Phase 1

Design & Measure

Nov 16, 2026 to Nov 20, 2026

5 business days

On-site measure, existing-condition photos, and finish confirmation for the kitchen. Drawings and a written schedule go to the client before demolition.

Phase 2

Demolition & Prep

Nov 23, 2026 to Dec 2, 2026

8 business days

Protect adjacent rooms, remove designated finishes, and prepare substrate, plumbing, and electrical rough-in for the kitchen.

Phase 3

Install & Finish

Dec 3, 2026 to Dec 24, 2026

16 business days

Set cabinets or vanities, counters, tile, fixtures, lighting, and flooring in the published sequence, then punch remaining items.

Phase 4

Walkthrough & Handoff

Dec 29, 2026 to Dec 30, 2026

2 business days

Client walkthrough, care notes, and close-out of remaining items. Final balance is due on completion.

Investment

Proposal line items in Canadian dollars
Item Code Amount (CAD)
Kitchen cabinetry package: made-to-measure boxes, doors, and hardware KIT-CAB CA$18,500.00
Kitchen countertops: quartz slab supply and finish KIT-CNT CA$7,200.00
Kitchen lighting: ceiling, under-cabinet, and control KIT-LGT CA$1,800.00
Kitchen design consultation: measure, drawings, and schedule KIT-DSN CA$1,500.00
Total CA$29,000.00
50% deposit, due at signing CA$14,500.00
50% balance, due on completion CA$14,500.00

Prices shown before applicable taxes

Terms

  • Figures are in Canadian dollars and are valid until Oct 31, 2026.
  • Prices shown before applicable taxes. Applicable taxes are determined at signing.
  • A 50% deposit (CA$14,500.00) is due at signing. The remaining CA$14,500.00 is due on completion.
  • Deposit refundable until 5 business days before scheduled kickoff, minus documented out-of-pocket costs; non-refundable once the first kickoff meeting happens.
  • Refund deadline for this proposal: Nov 9, 2026 (five business days before kickoff on Nov 16, 2026).
  • Timelines count business days only (Monday to Friday, excluding Ontario public holidays) and assume site access plus timely selections.
  • Changes to scope after signing are priced as written change orders before the extra work starts.

Signature

Awaiting send. Use Send to client, then the signer can draw on the pad.

Jordan Reyes